Armamar, Portugal
Mavel was contracted to provide production, delivery, assembly and commissioning of one Pelton turbine for the new 750 kW Armamar hydro plant on the Temilobos river in Portugal. Mavel also provided the generator, electrical part and governing/control equipment. Commissioning was in 2006.
Go to Detail and Photo
Yeghesis , Armenia
Mavel provided two vertical Pelton turbines with runner diameter of 1060 mm as part of its contract for the design, production, assembly supervision and commissioning of this 13 MW plant. The delivery included hydraulics, butterfly valves and water cooling unit. Commissioning for the first turbine was in 2004 with the second in 2006.
Go to Detail and Photo
Bela Mesta, Bulgaria
As part of the two plant Bela and Cherna Mesta hydroelectric power development project in Pazardzik, Bulgaria., Mavel was contracted to provide a Vertical Pelton turbine for the Bela Mesta hydroelectric power plant. This 668 kW new hydroelectric power plant was commissioned in the spring of 2007. In addition to the turbine, Mavel provided the generator, butterfly valve, governing system and supervision of assembly, testing and commissioning.
Go to Detail and Photo
Cherna Mesta, Bulgaria
As part of the same two plant development project, Mavel was contracted to provide a Vertical Pelton turbine for the new Cherna Mesta hydroelectric power plant also in Pazardzik, Bulgaria. This 668 kW new hydroelectric power plant was commissioned in the spring of 2007. In addition to the turbine, Mavel provided the generator, butterfly valve, governing system and supervision of assembly, testing and commissioning.
Go to Detail and Photo