Yeghesis, Armenia
Two Pelton Turbines = 12.9 MW Installed Power

Project Highlights:

The Yeghesis hydroelectric power plant is the largest private hydroelectric power plant in Armenia.  The plant was developed in two phases over three years.  Mavel provided its turbines to Slovak company VUJE Trnava who was the general contractor.


Project Facts:

Yeghesis River,  Kavkaz Mountains,Armenia

VÚJE Trnava, a.s., Slovakia
AOZT Bazenc, Armenia
New

Head = 250 m
Flow max = 3 cms

Two Vertical Pelton
12 920 kW (6460 kW per unit)

Turbines
Governor
Butterfly Valve
Hydraulic System
Assembly Supervision
Testing
Commissioning

2006
« back


View from the Kavkaz mountains to the site
of the new 13 MW hydro station


Mavel’s two Vertical Pelton turbines
after complete installation