Project Highlights:
The Yeghesis hydroelectric power plant is the largest private hydroelectric power plant in Armenia. The plant was developed in two phases over three years. Mavel provided its turbines to Slovak company VUJE Trnava who was the general contractor.
Project Facts:
| Location | Yeghesis River, Kavkaz Mountains,Armenia |
| Customer | VÚJE Trnava, a.s., Slovakia |
| Final Customer | AOZT Bazenc, Armenia |
| Project Type | New |
| Site Data | Head = 250 m |
| Turbine | Two Vertical Pelton |
| Total Power | 12 920 kW (6460 kW per unit) |
| Mavel Supply | Turbines |
| Commissioning | 2006 |