Cherna Mesta, Bulgaria
One Vertical Pelton = 668 kW Installed Power

Project Highlights:

The placement of this turbine was directly in front of Mount Fuji and the second Mavel turbine installed in Japan with Mavel’s partner Himavari N.E. CO., Ltd. The entire project took only eleven months from signing of the contract in August 2003 to taking over in July 2004.


Project Facts:

Pazardzik, Bulgaria

Cherna Mesta Ltd.
New

Head = 98 m
Flow = 0.8 cms

One Vertical Four Nozzle Pelton
668 kW

Turbine
Asynchronous Generator
Butterfly Valve
Governing System
Spare Parts
Assembly Supervision
Testing
Commissioning

April 2007
« back


Mavel’s Pelton turbine at Cherna Mesta powerhouse.