Zawada, Poland
Two Kaplan Turbines: Installed Power 1.5 MW

Project Highlights:

The Zawada hydroelectric power project was Mavel’s 20th installation in Poland.  The two turbines, with runner diameters of 3000 cm, were one of the largest Kaplan turbines designed, produced and installed by Mavel at that time.


Project Facts:

Odra River, Southern Poland

NAVIGA Sp. Z o.o. / HCS Wroclaw, Spolka z.o.o.

HCS Wroclaw, Spolka z.o.o.

Head = 1.7 to 2.5 m
Flow = 43 cms

Two Kaplan turbines KP3000K3

1.5 MW ( 750 kW per unit )

Turbines
Asynchronous Generators
Gearboxes
Hydraulic System
Electrical Equipment
Lubrication Set
Cooling Set
Supervision of Assembly
Testing
Commissioning

May 2006