Pontey I and II, Italy
Four Kaplan Turbines = 1.84 MW Installed Power

Project Highlights:

This project is situated in one of the most beautiful parts of Europe – in Italy near the French border. Water damage in the powerhouses at the start of installation caused significant delays with much of the equipment having to be reconditioned and repaired.  This installation brings the total number of turbines Mavel has installed in Italy in the past four years to thirteen.


Project Facts:

Pontey and Chatillon towns, river Dora  Baltéa

ABB Energy Automation S.p.A.

Energia Plassier s.r.l.

New

Pontey I:   
Pontey II:  

Head = 3.89 m, Flow = 17.35 cms
Head = 4.61m, Flow  = 13.85 cms

Pontey I:   
Pontey II:  

2 Kaplan Bulb turbines KA1800K3
2 Kaplan Bulb turbines KA1580K4

Pontey I:   
Pontey II:  

884 kW (442 kW per unit)
960 kW (480 kW per unit)

Turbines
Generators
Governor
Lubrication System
Cooling System
Supervision of Installation
Testing
Commissioning

2007